Project Name:

Cranswick Convenince Foods – Hull

Project Type:
Factory Low Voltage Distribution Upgrade/Additional production lines
Project Value:
£90k
About the project:

The main slicing hall containing 11 x production lines increased to 12 .existing distribution network increased capacity. New LV Distribution equipment installed.

Installed supplies to existing and new production lines.